|
Product Details:
|
| Material: | Hot-dip Galvanized Steel | Rib Depth: | 18-20mm |
|---|---|---|---|
| Rib Distance: | 150mm | Sheet Width: | 300-700mm |
| Sheet Length: | 2000-2500mm | Sheet Thickness: | 0.40-0.60mm |
| Zinc Coating: | 120-275 G/m2 | Coat Thickness: | 25-40mm |
| Highlight: | deep rib lath,heavy build stucco lath,wide rib plaster base |
||
Heavy build stucco needs a base that can hold a 25-40mm coat without the reinforcement settling out of plane. Deep rib lath meets that requirement by spacing ribs at 18-20mm and setting them 150mm apart, which creates a stiffened sheet with enough depth for the mortar to bury the strands completely while the rib crowns stay at a constant distance from the substrate.
The deep profile also gives the plasterer a visible depth gauge. Because the original rib height is fixed, the operative can judge coat thickness from the rib as the work proceeds instead of relying on dabs and screed rails, and the finished wall keeps a consistent plane even where the masonry behind it wanders. Sheet body is rolled from 0.40-0.60mm galvanized steel to resist the point loads of a heavily built coat.
Key Features| Parameter | Specification |
|---|---|
| Material | Hot-dip galvanized steel sheet |
| Surface Treatment | Galvanized, zinc 120-275 g/m2 |
| Rib Depth | 18-20mm |
| Rib Distance | 150mm |
| Sheet Width | 300-700mm |
| Sheet Length | 2000-2500mm |
| Sheet Thickness | 0.40-0.60mm |
| Open Area | 35-60 percent |
| Recommended Coat | 25-40mm stucco, two or three coat |
| Standard | ASTM C1063, EN 13658-1 |
The product is used for exterior stucco on blockwork, brick and concrete walls, for steel frame residential construction, and for parapets, chimney breasts and gable ends where a thick weather coat is required. It is also common behind exterior insulation and finish systems where the reinforced base coat needs a rigid, well-drained carrier.
In repair work it is installed over deteriorated render that cannot be fully removed, bridging the failed zone and giving the new coat an independent, mechanically fixed base rather than one bonded to an unstable surface.
Installation and HandlingPanels are fixed rib-out with the ribs running horizontally, using galvanized screws with 25mm washers at 150mm centres into studs or masonry plugs, plus a fixing at every rib crossing. Vertical laps are 25mm, horizontal laps 50mm, and all laps are wired before the scratch coat.
A three coat system is standard: scratch, brown and finish. The scratch coat is pressed hard into the mesh to fill the ribs, cured for at least 48 hours, then the brown coat brings the wall out to the rib crown. On tall walls, movement joints are carried through the lath by cutting a 10mm gap and backing it with a compressible bead.
Packaging and Quality AssuranceBundles of 100 sheets are strapped on timber pallets with cardboard corner angles and a waterproof top cover. Because the panels are wide, bundles are stacked no more than three high in the container and secured with timber bearers to stop the ribs deforming in transit.
Factory checks cover rib height, rib pitch, thickness, zinc coating and the straightness of the panel edge, which matters on long runs where a bowed edge shows as a visible line in the finish. A pull-off test report from an independent laboratory is supplied with every project order.
Contact Person: Mr. Harrison
Tel: +8616631807785